⎝⎛斗牛平台⎞⎠

沈阳深井潜水泵有限公司

Product Categories

contact us

Shenyang Shenjing Submersible Pump Co., Ltd.

Phone: Ji Liang: 13238884288

Contact address: North Liguanxi Heping Industrial Park, Yuhong District, Shenyang

Contact Tel: Northeast Sales Tel: 024-25823018 89361125 89361461

Other areas: 024-25512305 25820388

Contact Fax: 024-89361960

Email: shenjingbengye@163.com

Contact: Sales Department: 89361125, After-sales Service Department: 024-89361859

Website: adspond.icu


Explosion-proof submersible sewage pump

Explosion-proof submersible sewage pump

  • 防爆潜污泵
  • Category: Submersible sewage pump

  • hit count:
  • Release Date: 2018/02/08
  • More
  • Online Inquiry
Detailed introduction

防爆潜污泵

Product Overview

WQB, QWB, BQW, BWQ explosion-proof and non-blocking submersible sewage pumps are new explosion-proof equipment designed and produced according to national standards on the basis of international advanced flame-proof submersible sewage pump technology. The pump is composed of an explosion-proof electric motor and a lower pump coaxially mounted submersible sewage pump, the enclosure protection level is IP68, and the explosion-proof level is ExdIIBT4. It is suitable for safety emission and other explosion-proof places in coal mine, chemical, petroleum and other industries with methane or coal dust explosive gas mixtures. It completely solves the danger that ordinary submersible sewage pumps do not have special explosion-proof devices, thick slurry pumps cannot pump larger particles, and the problems that sewage pumps are easily blocked.

Structural features:

The explosion-proof motor is located on the upper part of the electric pump, and the insulation level of the explosion-proof motor is Class F. The shaft seal is a combination of a rotary seal ring and a double-end mechanical seal. The rotary seal ring can prevent the intrusion of mud and reduce the pump pressure. It is directly applied to the mechanical seal, which serves as the first line of seal defense. There are two sets of seals, the first set is the initial seal on the pump side to seal the sewage, the second set is the secondary seal on the motor side to seal the leakage of the lubricating oil, and the full set of mechanical seals are immersed in the # 20 turbine oil. Cooling and lubrication to the seal.

Second, explosion-proof points:

1. When an explosive mixture inside the electric pump produces an explosion, the flameproof enclosure is not damaged, and the internal explosion cannot pass through the flameproof joint surface, causing the external explosive mixture to explode.

2. The parts that make up the flameproof enclosure are hydraulically tested piece by piece according to the provisions of Items 1, 2, and 3 of GB3836 to ensure that they can withstand the maximum internal explosion pressure.

3. The flameproof joint surface, length gap, and roughness of each component meet the requirements of GB3836.2.

4. The bolts connected to the flameproof enclosure are equipped with anti-loosening gasket washers. The bolt head is set in a protective ring to prevent it from falling off by itself.

5. The base, upper cover, shaft, front shaft cover, terminal box cover, terminal block, terminal screw and terminal sleeve are explosion-proof parts. Comes with a 10-meter explosion-proof cable.

3. Conditions of use:

1. The altitude does not exceed 1000 meters;

2. The water temperature does not exceed 40 ° C;

3. PH value of water is 6-9;

4. The power supply voltage is 220V / 380V / 440V / 660V;

5, frequency 50HZ-60HZ;

6. The contained solid particles and fibers do not exceed the requirements of the conditions;

7. Various types of sewage water containing a specified volume of soft materials and higher viscosity;

8. The working method is a continuous quota based on continuous working system (SI).

4. Meaning of model:

40 QW, WQ PB 15 – 30 – 2.2

40-outlet diameter (mm)

QW, WQ-submersible sewage pump

P-stainless steel

B- Flameproof

15-Flow (m3 / h)

30-head (m)

2.2- Motor power (kw)

Five, matters needing attention:

1. In order to ensure the safety and reliability of the electric pump, a special explosion-proof control box should be used when using it;

3. The explosion-proof control box of the electric pump should be connected to a power source with the same voltage and frequency. The voltage fluctuation tolerance is ± 10% of the rated voltage;

4. After the electric pump is started, pay attention to whether the impeller is turned correctly. If the steering does not correspond, handle it in time;

5, pay attention to the use of electric pumps, must not be buried in soil and sand, the outlet pipe must not be blocked by soil and sand, it is best to use suspension and other methods when using. The bottom of the pump leaves dirt. It is not allowed to lay on the ground horizontally, let alone sink into the dirt. When you stop using it, you should lift the pump out of water and clean it.

6. When moving the electric pump, cut off the power supply, and do not pull the insulated cable with force. No one should touch the water source when the electric pump is running.

7. When the electric pump fails, it should be inspected in time, analyze the cause of the electric pump failure, and take measures to eliminate the fault before continuing to use it.

6. Maintenance and use:

1. Periodically measure the insulation resistance of the electric pump at the end of the cable. Its insulation resistance must be above 1 Megohm, otherwise it must be disassembled for maintenance;

2. The shaft sealing device of the electric pump between the motor and the pump is composed of a double-end mechanical seal and a rotary seal ring. However, during maintenance, it should be checked if it is found that the lubrication is turbid, if it becomes dark or contains too much water, it should be disassembled for inspection. The lubricating oil should be changed regularly (the lubricating oil is No. 20 turbine oil, and the oil volume is 85% of the oil chamber volume)

3. In principle, the flameproof motor is not allowed to be dismantled randomly. If the flameproof motor fails, it can be returned to the factory for repair. When the user needs to disassemble, he should pay attention to protecting the flameproof surface and not to damage it. , 2, 3 relevant provisions.


Related tags: Submersible sewage pump , Explosion-proof submersible sewage pump price , Wholesale explosion-proof submersible sewage pump

Previous: Non-blocking submersible sewage pump
Next: No more

Recently Viewed:

    Into the deep well
    Company Profile
    contact us
    Qualification honor
    Product center
    Deep well submersible pump
    Centrifugal pump
    Submersible sewage pump
    Submersible pump
    Chemical pump
    Frequency counter
    Accessories
    News Center
    company ⎝⎛斗牛平台⎞⎠
    Industry ⎝⎛斗牛平台⎞⎠
    Common ⎝⎛斗牛平台⎞⎠
    Global distribution
    Agent
    guest Department
    Branch
    Product export

    contact address: North Liguanxi Peace Industrial Park, Yuhong District, Shenyang

    Phone: Ji Liang: 13238884288

    contact number: Northeast Sales Tel: 024-25823018 89361125 89361461

    Other sales areas: 024-25512305 25820388

    Contact Fax: 024-89361960

    company website: adspond.icu

    E-mail: shenjingbengye@163.com

    Contact: Sales Department: 89361125, After-sales Service Department: 024-89361859

    抚顺 大连 丹东 盘锦 大庆 黑龙江 吉林 沈阳 内蒙 Hot Products | Main Area: Anshan Fushun Dalian Dandong Panjin Daqing Heilongjiang Jilin Shenyang Inner Mongolia
    online service
    share it One-click sharing
    Welcome to leave us a message
    Please enter your message here, we will contact you as soon as possible.
    Name
    Contact person
    phone
    Landline / mobile number
    mailbox
    mailbox
    address
    address
    七乐彩 欢乐拼三张 星力捕鱼 欢乐拼三张